It started by cleaning out our master bedroom and ripping out the rug and padding. I was also able to pull the baseboards. It’s now all prepped for painting and the eventual hardwood installation. My attention then shifted to all the work I need to do out in the garage.
I was able to install an electric heater to help heat the garage, a couple of additional electrical outlets on their own 20A circuits, hung 6 flourecent shop lights, put together a shelf, and started some inventory.
Up next is to build benches, get the shop air plumbed, and finish the inventory.